E1070 over MONTEZUMA CREEK

0.1E OKF C/L; 2.0N OLD 62 · County 111, Oklahoma · Built 1997 · 2 Lanes · 150 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
247580000000000
Year Built
1997
Length
16.2 m (53.1 ft)
Max Span
15.5 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
150
Material
Prestressed Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$232,000
Total Project Cost
$369,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.