N3920 TURKEY PEN over MONTEZUMA CREEK TRIB.

1.5N 62B 3E OKF C/L · County 111, Oklahoma · Built 2022 · 2 Lanes · 700 vehicles/day

Overall
Good
Culvert
9
Excellent

Bridge Details

Structure #
327260000000000
Year Built
2022
Length
8.8 m (28.9 ft)
Max Span
4.3 m
Width
7.3 m (24 ft)
Lanes
2
Daily Traffic
700
Material
Concrete
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.