U.S. 75 over BIRD CREEK

6.8 MI N OF I-244 · County 143, Oklahoma · Built 1989 · 2 Lanes · 18,250 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
224060000000000
Year Built
1989
Length
112.2 m (368.1 ft)
Max Span
30.5 m
Width
12.8 m (42 ft)
Lanes
2
Daily Traffic
18,250
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,594,000
Total Project Cost
$4,464,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.