U.S. 75 NB over BIRD CREEK OFLOW

0.4 MI N 56 ST · County 143, Oklahoma · Built 1971 · 3 Lanes · 16,400 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
181350000000000
Year Built
1971
Length
121.9 m (399.9 ft)
Max Span
15.2 m
Width
17.2 m (56.4 ft)
Lanes
3
Daily Traffic
16,400
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,332,000
Total Project Cost
$6,530,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.