U.S. 59 over BARREN FORK CREEK

6.6 MI.N.JCT.SH 51 · County 001, Oklahoma · Built 1981 · 2 Lanes · 3,800 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
199990000000000
Year Built
1981
Length
122.5 m (401.9 ft)
Max Span
30.5 m
Width
13.9 m (45.6 ft)
Lanes
2
Daily Traffic
3,800
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,004,000
Total Project Cost
$2,812,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.