S.H. 325 over CARRIZOZO CREEK
OKLA-NEW MEXICO S/L · County 025, Oklahoma · Built 1981 · 2 Lanes · 70 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
36.901506, -103.002142
This bridge is in worse condition than 91.1% of bridges in County 025. The average bridge in Oklahoma is 0 years old; this one is 45 years old.
Nearby Bridges
S.H. 325 over CREEK
Built 1995
NM-406 over CARRIZOZO CREEK
Built 1984
S.H. 325 over CREEK
Built 1995
1336C over CIMARRON RIVER
Built 1969
NM-456 over UNNAMED WATERWAY
Built 1988
NM-406 over ROAD CANYON DRAW
Built 1957
N0035 over N. CARRIZO CREEK
Built 2000
NM-456 over UNNAMED WATERWAY
Built 1988
N0027 over N. CARRIZO CREEK
Built 2000
D0035 over CREEK
Built 1956
Bridge Details
- Structure #
- 199980000000000
- Year Built
- 1981
- Length
- 122.2 m (400.9 ft)
- Max Span
- 30.5 m
- Width
- 10.4 m (34.1 ft)
- Lanes
- 2
- Daily Traffic
- 70
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,004,000
- Total Project Cost
- $2,812,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.