FAU 4517 (A ST) over CANAL
BETW. SENECA & CREEK AVE. · County 121, Oklahoma · Built 1980 · 2 Lanes · 200 vehicles/day
Overall
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
34.914403, -95.772644
This bridge is in worse condition than 83% of bridges in County 121. The average bridge in Oklahoma is 0 years old; this one is 46 years old.
Nearby Bridges
V.HUBERT SMITH DR. over CREEK
Built 1977
N4075 (7 ST.) over DRAINAGE CANAL
Built 1946
FAU 4472 (SOUTH AV over DRAINAGE CANAL
Built 1977
E1447 (SENECA) over DRAINAGE CANAL
Built 1975
E1446 (MIAMI) over CREEK (CANAL)
Built 1975
E1445 (OSAGE) over DRAINAGE CANAL
Built 1975
E1444 (SEMINOLE over DRAINAGE CANAL
Built 1975
N4076 (8 ST.) over DRAINAGE CANAL
Built 1975
E1443 (COMANCHE over DRAINAGE CANAL
Built 1975
FAU 4529 (6 ST) over DRAINAGE CANAL
Built 1950
Bridge Details
- Structure #
- 197420000000000
- Year Built
- 1980
- Length
- 16.5 m (54.1 ft)
- Max Span
- 16.5 m
- Width
- 10.8 m (35.4 ft)
- Lanes
- 2
- Daily Traffic
- 200
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $230,000
- Total Project Cost
- $366,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.