N4076 (8 ST.) over DRAINAGE CANAL
100 FT S OF COMANCHE AVE. · County 121, Oklahoma · Built 1975 · 2 Lanes · 200 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
34.923128, -95.7617
This bridge is in worse condition than 41.1% of bridges in County 121. The average bridge in Oklahoma is 0 years old; this one is 51 years old.
Nearby Bridges
E1443 (COMANCHE over DRAINAGE CANAL
Built 1975
E1444 (SEMINOLE over DRAINAGE CANAL
Built 1975
E1445 (OSAGE) over DRAINAGE CANAL
Built 1975
FAU 4529 (6 ST) over DRAINAGE CANAL
Built 1950
E1446 (MIAMI) over CREEK (CANAL)
Built 1975
E1447 (SENECA) over DRAINAGE CANAL
Built 1975
FAU 4472 (SOUTH AV over DRAINAGE CANAL
Built 1977
N4072 (2 ND ST) over DRAINAGE CANAL
Built 1975
U.S. 270 EB over A OK R.R. & 9 ST.UNDER
Built 1965
U.S. 270 over UP R.R. UNDER
Built 1964
Bridge Details
- Structure #
- 188840000000000
- Year Built
- 1975
- Length
- 9.1 m (29.9 ft)
- Max Span
- 4 m
- Width
- 8.5 m (27.9 ft)
- Lanes
- 2
- Daily Traffic
- 200
- Material
- Concrete
- Design
- Culvert
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $100,000
- Total Project Cost
- $225,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.