E1460 over FLOOD CANNAL

8S ; .5W OF HOBART · County 075, Oklahoma · Built 1978 · 2 Lanes · 100 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 8 Very Good
Superstructure 8 Very Good
Substructure 7 Good

Location

34.899686, -99.102378

This bridge is in worse condition than 33.1% of bridges in County 075. The average bridge in Oklahoma is 0 years old; this one is 48 years old.

Nearby Bridges

Bridge Details

Structure #
194130000000000
Year Built
1978
Length
15.2 m (49.9 ft)
Max Span
14.6 m
Width
6.7 m (22 ft)
Lanes
2
Daily Traffic
100
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$216,000
Total Project Cost
$343,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.