E1440 over FLOOD CANNEL

6. S .5 W OF HOBART · County 075, Oklahoma · Built 1972 · 2 Lanes · 100 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 8 Very Good
Superstructure 8 Very Good
Substructure 7 Good

Location

34.928711, -99.105422

This bridge is in worse condition than 33.1% of bridges in County 075. The average bridge in Oklahoma is 0 years old; this one is 54 years old.

Nearby Bridges

Bridge Details

Structure #
182390000000000
Year Built
1972
Length
15.8 m (51.8 ft)
Max Span
14.6 m
Width
6.7 m (22 ft)
Lanes
2
Daily Traffic
100
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$225,000
Total Project Cost
$358,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.