U.S. 64 / S.H. 51 over ST LOUIS STREET UNDER
0.7 MI E I-444 · County 143, Oklahoma · Built 1976 · 8 Lanes · 83,900 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
36.142667, -95.958328
This bridge is in worse condition than 83.3% of bridges in County 143. The average bridge in Oklahoma is 0 years old; this one is 50 years old.
Nearby Bridges
U.S. 64 EB over LEWIS AVE UNDER
Built 1968
U.S. 64 WB over 15 ST. UNDER
Built 1968
U.S. 64 WB over LEWIS AVE UNDER
Built 1968
U.S. 64 EB over 15 ST. UNDER
Built 1968
U.S. 64 / S.H. 51 over UTICA STREET UNDER
Built 1976
E0618(E.29TH.ST.) over CROW CREEK
Built 1955
U.S. 64 / S.H. 51 over 21ST ST. UNDER
Built 1968
U.S. 64 / S.H. 51 over 21ST ST. UNDER
Built 1968
PEORIA AVE. over U.S64/SH51 US75NB RAMP
Built 1976
U.S. 64 /S.H. 51EN over 13TH ST. UNDER
Built 1980
Bridge Details
- Structure #
- 192110000000000
- Year Built
- 1976
- Length
- 30.5 m (100.1 ft)
- Max Span
- 30.5 m
- Width
- 49.7 m (163.1 ft)
- Lanes
- 8
- Daily Traffic
- 83,900
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,488,000
- Total Project Cost
- $4,167,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.