PEORIA AVE. over U.S64/SH51 US75NB RAMP
0.4 MI E I-444 · County 143, Oklahoma · Built 1976 · 4 Lanes · 5,000 vehicles/day
Overall
Deck
5
Fair
Superstructure
7
Good
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 7 | Good |
| Substructure | 5 | Fair |
Location
36.142711, -95.975758
This bridge is in worse condition than 83.3% of bridges in County 143. The average bridge in Oklahoma is 0 years old; this one is 50 years old.
Nearby Bridges
U.S. 64 /S.H. 51EN over 13TH ST. UNDER
Built 1980
I-444 over DETROIT & 13 ST. UNDER
Built 1981
8TH ST TO US64 EB over U.S64/75/SH51/13/DETROIT
Built 1981
U.S. 75 SB US64EB over U.S64/75/SH51/13/DETROIT
Built 1981
U.S. 64 EB US75NB over US64/SH51WB/13ST/DETROIT
Built 1981
CINCINNATI AVE. over U.S. 64 / US 75 / SH 51
Built 1982
I-444 over 11TH ST. UNDER
Built 1979
12TH ST. over U.S. 64 / US 75 / SH 51
Built 1971
U.S. 64 / S.H. 51 over UTICA STREET UNDER
Built 1976
BOSTON AVE. over U.S. 64 / US 75 / SH 51
Built 1976
Bridge Details
- Structure #
- 192540000000000
- Year Built
- 1976
- Length
- 78 m (255.9 ft)
- Max Span
- 39.3 m
- Width
- 23.5 m (77.1 ft)
- Lanes
- 4
- Daily Traffic
- 5,000
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,919,000
- Total Project Cost
- $5,374,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.