S.H. 99 over S.H. 3 UNDER

2.4 MI S-E SH 3W JCT · County 123, Oklahoma · Built 1973 · 2 Lanes · 2,400 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Condition Ratings

ComponentRatingDescription
Deck 8 Very Good
Superstructure 8 Very Good
Substructure 8 Very Good

Location

34.726019, -96.634878

This bridge is in worse condition than 33.6% of bridges in County 123. The average bridge in Oklahoma is 0 years old; this one is 53 years old.

Nearby Bridges

Bridge Details

Structure #
186000000000000
Year Built
1973
Reconstructed
2023
Length
111.6 m (366.1 ft)
Max Span
39.6 m
Width
15.1 m (49.5 ft)
Lanes
2
Daily Traffic
2,400
Material
Steel Continuous
Design
Girder and Floorbeam System
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$973,000
Total Project Cost
$2,725,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.