S.H. 3 SD over CLEAR BOGGY CREEK

400 E OF SH 3; SD · County 123, Oklahoma · Built 1973 · 2 Lanes · 500 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
8
Very Good
Substructure
5
Fair

Bridge Details

Structure #
184850000000000
Year Built
1973
Reconstructed
2015
Length
42.1 m (138.1 ft)
Max Span
14 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
500
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$617,000
Total Project Cost
$1,728,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.