IRR N4592 over CREEK

2. W. & 0.8N. OF FAIRLAND · County 115, Oklahoma · Built 1990 · 1 Lanes · 100 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 5 Fair
Superstructure 5 Fair
Substructure 7 Good

Location

36.769514, -94.837347

This bridge is in worse condition than 67.2% of bridges in County 115. The average bridge in Oklahoma is 0 years old; this one is 36 years old.

Nearby Bridges

Bridge Details

Structure #
069590000000000
Year Built
1990
Length
11.4 m (37.4 ft)
Max Span
5.5 m
Width
4.5 m (14.8 ft)
Lanes
1
Daily Traffic
100
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$95,000
Total Project Cost
$225,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.