N4580 over CREEK

.5S.E. & S.E. OF FAIRLAN · County 115, Oklahoma · Built 1938 · 2 Lanes · 100 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Condition Ratings

ComponentRatingDescription
Deck 5 Fair
Superstructure 5 Fair
Substructure 6 Satisfactory

Location

36.747467, -94.837378

This bridge is in worse condition than 67.2% of bridges in County 115. The average bridge in Oklahoma is 0 years old; this one is 88 years old.

Nearby Bridges

Bridge Details

Structure #
055290000000000
Year Built
1938
Length
7.9 m (25.9 ft)
Max Span
3 m
Width
9.9 m (32.5 ft)
Lanes
2
Daily Traffic
100
Material
Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$152,000
Total Project Cost
$241,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.