IR 75 over USR 6

1.68 mi. South of SR 64 · County 173, Ohio · Built 2015 · 3 Lanes · 25,000 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
8703701
Year Built
2015
Length
62.5 m (205.1 ft)
Max Span
30.2 m
Width
19.2 m (63 ft)
Lanes
3
Daily Traffic
25,000
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.