IR 75 over PORTAGE RIVER NORTH BR

0.9 Mi. S. of USR 6 · County 173, Ohio · Built 1969 · 3 Lanes · 24,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
8703574
Year Built
1969
Reconstructed
2016
Length
36.3 m (119.1 ft)
Max Span
13.7 m
Width
25 m (82 ft)
Lanes
3
Daily Traffic
24,000
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.