DOVER TWP CR 80 over SUGAR CREEK
0.20 MILE W. OF I77 · County 157, Ohio · Built 2010 · 2 Lanes · 1,023 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
40.550011, -81.5059
This bridge is in worse condition than 26.1% of bridges in County 157. The average bridge in Ohio is 0 years old; this one is 16 years old.
Nearby Bridges
CO RD 80 (OHIO AVE over I 77
Built 2010
DOVER TWP RD 374 over BRANCH OF SUGARCREEK
Built 2012
DOVER WOOSTER AVE. over GOETTGE RUN
Built 2002
E 20TH STREET over GOETTGE RUN
Built 2024
WEST 15TH ST over GOETTGE RUN
Built 1972
IR 77 & US 250 over GOETTGE RUN
Built 1963
IR 77 & US 250 over GOETTGE RUN
Built 1963
DOVER TWP RD 205 over GOETTGE RUN
Built 1969
WALNUT STREET over GOETTGE RUN
Built 2003
SR 39 over SUGAR CREEK
Built 2009
Bridge Details
- Structure #
- 7930569
- Year Built
- 2010
- Length
- 41.5 m (136.2 ft)
- Max Span
- 19.9 m
- Width
- 26.8 m (87.9 ft)
- Lanes
- 2
- Daily Traffic
- 1,023
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.