IR 77 & US 250 over GOETTGE RUN

4.11 MI. S. OF JCT. US250 · County 157, Ohio · Built 1963 · 2 Lanes · 21,651 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
7903308
Year Built
1963
Length
24.4 m (80.1 ft)
Max Span
8.2 m
Width
19 m (62.3 ft)
Lanes
2
Daily Traffic
21,651
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.