I.R. 76 over OVER WOOSTER-EAST AVE

JCT SR 619 AND IR 76 · County 153, Ohio · Built 2021 · 8 Lanes · 77,400 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
7705493
Year Built
2021
Length
39.7 m (130.2 ft)
Max Span
39.2 m
Width
47.5 m (155.8 ft)
Lanes
8
Daily Traffic
77,400
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$25,562,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.