Rmp B1 to IR 76 WB over Ramp B1 over Mud Run

JCT SR 619 AND IR 76 · County 153, Ohio · Built 2021 · 1 Lanes · 2,100 vehicles/day

Overall
Good
Culvert
8
Very Good

Bridge Details

Structure #
7705435
Year Built
2021
Length
10.7 m (35.1 ft)
Max Span
9.8 m
Lanes
1
Daily Traffic
2,100
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$25,562,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.