IR76 RAMP OV SWEIT over I76RAMP W-5A/SWEITZER/CS

0.73 MI E OF SR 59 · County 153, Ohio · Built 2019 · 2 Lanes · 3,350 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
7703287
Year Built
2019
Length
63.9 m (209.6 ft)
Max Span
23.7 m
Width
13.8 m (45.3 ft)
Lanes
2
Daily Traffic
3,350
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$84,228,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.