WOLF LEDGES PRKWY over I-76
0.79 MI W OF SR 8 · County 153, Ohio · Built 2017 · 3 Lanes · 4,705 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
41.062389, -81.519581
This bridge is in worse condition than 27% of bridges in County 153. The average bridge in Ohio is 0 years old; this one is 9 years old.
Nearby Bridges
Grant Street over IR76 & IR77 NB ONLY
Built 2017
IR76 over I76RAMP W-5/SWEITZER/CSX
Built 2018
THORNTON ST C647 over CSX & CONRAIL RR. (114)
Built 1930
SOUTH ST (CR 7045) over 248 SWEITZER AV & CSX RR
Built 2020
IR76 RAMP OV SWEIT over I76RAMP W-5A/SWEITZER/CS
Built 2019
I76/BDWY SWEITZ over IR 76 OV SWEITZERAVECSXT
Built 2018
I76 OV SWEITZER R over I-76RAMP W-6/SWEITZER/CS
Built 2018
I-76 over IR 76 OV S MAIN STREET
Built 2018
I-76 over OVER BROWN ST CR-652
Built 1961
BARTGES ST (CR646) over GARAGE DR (151) AKRON
Built 2018
Bridge Details
- Structure #
- 7703139
- Year Built
- 2017
- Length
- 79.6 m (261.2 ft)
- Max Span
- 44.8 m
- Width
- 15.5 m (50.9 ft)
- Lanes
- 3
- Daily Traffic
- 4,705
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $84,229,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.