USR 30 over OVER ASHLAND RAILWAY

0.36 MILES EAST OF SR13 · County 139, Ohio · Built 2021 · 6 Lanes · 28,500 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
7001232
Year Built
2021
Length
65.3 m (214.2 ft)
Max Span
26.8 m
Width
36.5 m (119.8 ft)
Lanes
6
Daily Traffic
28,500
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.