SR 13 over TRIBUTARY OF ROCKY FORK

.32 MI N US 30 · County 139, Ohio · Built 1995 · 2 Lanes · 11,704 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
7000731
Year Built
1995
Length
13.7 m (44.9 ft)
Max Span
13.4 m
Width
13.4 m (44 ft)
Lanes
2
Daily Traffic
11,704
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.