NEEDMORE ROAD over BARTLEY CREEK

0.9 MI W OF I 75 · County 113, Ohio · Built 1965 · 2 Lanes · 13,325 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
5761395
Year Built
1965
Length
28.3 m (92.8 ft)
Max Span
10.7 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
13,325
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.