NEEDMORE RD (CR74) over IR 75

3.15MI S OF JCT IR70 · County 113, Ohio · Built 1971 · 4 Lanes · 20,389 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
5708885
Year Built
1971
Reconstructed
2011
Length
62.5 m (205.1 ft)
Max Span
17.4 m
Width
23.8 m (78.1 ft)
Lanes
4
Daily Traffic
20,389
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.