RD 50 - CHIPPEWA over East Fork Black River

640 E of SR 83 · County 103, Ohio · Built 2019 · 2 Lanes · 421 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
5234272
Year Built
2019
Length
16.5 m (54.1 ft)
Max Span
14.3 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
421
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.