RD 29 - CONGRESS over Br. E. Br. Black River
5162 North of CH 102 · County 103, Ohio · Built 2015 · 2 Lanes · 447 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
41.05855, -82.054219
This bridge is in worse condition than 18.7% of bridges in County 103. The average bridge in Ohio is 0 years old; this one is 11 years old.
Nearby Bridges
RD 99 - SHAW RD over BR OF E BR BLACK RIVER
Built 1939
RD 69 - RICHMAN RD over EAST FORK BLACK RIVER
Built 1941
RD 99 - SHAW RD over BR OF E BR BLACK RIVER
Built 1939
RD 99 - SHAW RD over E Br Black River
Built 2020
USR 42 over W FORK E BR BLACK RIVER
Built 1957
USR 42 over W FORK E BR BLACK RIVER
Built 1957
USR 42 & USR 224 over E FORK E BR BLACK RIVER
Built 1958
USR 42 & USR 224 over E FORK E BR BLACK RIVER
Built 1958
RD 78 - KENNARD RD over East Fork Black River
Built 2018
RD 68 - OLD MILL over E BRANCH BLACK RIVER
Built 1975
Bridge Details
- Structure #
- 5243750
- Year Built
- 2015
- Length
- 19.5 m (64 ft)
- Max Span
- 17.7 m
- Width
- 9.1 m (29.9 ft)
- Lanes
- 2
- Daily Traffic
- 447
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.