IR 71 over OVER CHIPPEWA DITCH

0.16 MILES NORTH OF IR-76 · County 103, Ohio · Built 2008 · 3 Lanes · 20,848 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
5203015
Year Built
2008
Length
36 m (118.1 ft)
Max Span
35.1 m
Width
19.2 m (63 ft)
Lanes
3
Daily Traffic
20,848
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.