IR 71 over OVER IR-76

6.06 MILES NORTH OF SR-83 · County 103, Ohio · Built 2008 · 3 Lanes · 20,848 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
8
Very Good

Bridge Details

Structure #
5202957
Year Built
2008
Length
127.1 m (417 ft)
Max Span
38.3 m
Width
19.9 m (65.3 ft)
Lanes
3
Daily Traffic
20,848
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.