FRONT over NORFOLK SOUTHERN

FRONT · County 095, Ohio · Built 1998 · 4 Lanes · 6,316 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
4860519
Year Built
1998
Length
78.3 m (256.9 ft)
Max Span
29.3 m
Width
23.3 m (76.4 ft)
Lanes
4
Daily Traffic
6,316
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.