IR 280 RAMP Y over RAMP IR280 TO SR65 NSRR

NB RAMP Y FROM FRONT ST · County 095, Ohio · Built 2007 · 1 Lanes · 3,911 vehicles/day

Overall
Fair
Deck
9
Excellent
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
4805992
Year Built
2007
Length
706.2 m (2316.9 ft)
Max Span
34.1 m
Width
8.8 m (28.9 ft)
Lanes
1
Daily Traffic
3,911
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Single or Spread
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.