SR 65 over MAUMEE R RR SUMMIT ST

JCT. MAUMEE RIVER · County 095, Ohio · Built 1956 · 4 Lanes · 9,612 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
4805917
Year Built
1956
Reconstructed
1980
Length
512.1 m (1680.1 ft)
Max Span
67.7 m
Width
25.6 m (84 ft)
Lanes
4
Daily Traffic
9,612
Material
Steel
Design
Movable - Bascule
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,300,000
Total Project Cost
$2,500,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.