HOLLOWAY RD over I80 OHIO TPK

2.3MI WEST OF EXIT 59 · County 095, Ohio · Built 1954 · 2 Lanes · 7,770 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
4829573
Year Built
1954
Reconstructed
1990
Length
59.1 m (193.9 ft)
Max Span
20.1 m
Width
11.9 m (39 ft)
Lanes
2
Daily Traffic
7,770
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.