I475 NB over I80 SWN CR MANLEY RD

1.2 MI WEST OF EXIT 59 · County 095, Ohio · Built 1968 · 2 Lanes · 71,140 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
4807286
Year Built
1968
Reconstructed
2015
Length
212.8 m (698.2 ft)
Max Span
21.3 m
Width
20.4 m (66.9 ft)
Lanes
2
Daily Traffic
71,140
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.