Perrysburg Holland over IR 475

0.56 Mi. N. of IR 80/90 · County 095, Ohio · Built 1968 · 2 Lanes · 9,501 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
4807359
Year Built
1968
Reconstructed
2022
Length
125.8 m (412.7 ft)
Max Span
36.6 m
Width
11.1 m (36.4 ft)
Lanes
2
Daily Traffic
9,501
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.