IR 75 over BERDAN OTTAWA R. US24 CR

1.05 Mi. N. of I-475 · County 095, Ohio · Built 2018 · 4 Lanes · 61,427 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
4803795
Year Built
2018
Length
612.7 m (2010.2 ft)
Max Span
48.9 m
Width
23.5 m (77.1 ft)
Lanes
4
Daily Traffic
61,427
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.