IR 475 over WILLYS PARKWAY

JCT I-75 and WILLYS PKWY · County 095, Ohio · Built 2018 · 2 Lanes · 29,230 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
4803760
Year Built
2018
Length
33.7 m (110.6 ft)
Max Span
32.9 m
Width
13.7 m (44.9 ft)
Lanes
2
Daily Traffic
29,230
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.