SR775 over TRIB OF BUCKEYE CREEK

0.1 MI W OF SR378 · County 087, Ohio · Built 2016 · 2 Lanes · 200 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
4404921
Year Built
2016
Length
9.6 m (31.5 ft)
Max Span
9.1 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
200
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.