SR 775 over LONG CREEK

0.02 MI OF CR 64 · County 087, Ohio · Built 2021 · 2 Lanes · 658 vehicles/day

Overall
Good
Culvert
9
Excellent

Bridge Details

Structure #
4404808
Year Built
2021
Length
11 m (36.1 ft)
Max Span
10.4 m
Width
17.1 m (56.1 ft)
Lanes
2
Daily Traffic
658
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.