SR 2 over NEWELL CREEK

0.69 MI. E OF SR-306 · County 085, Ohio · Built 1997 · 2 Lanes · 28,194 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
4300912
Year Built
1997
Length
24.1 m (79.1 ft)
Max Span
23.5 m
Width
20.4 m (66.9 ft)
Lanes
2
Daily Traffic
28,194
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.