SR 2 EASTBOUND over SR 615 (LAK-615-0469)

2.61 MI. E. OF JCT SR 306 · County 085, Ohio · Built 1997 · 2 Lanes · 19,655 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
4301013
Year Built
1997
Length
55.8 m (183.1 ft)
Max Span
29 m
Width
16.8 m (55.1 ft)
Lanes
2
Daily Traffic
19,655
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.