TR115 over Jug Run

0.25 mi NE SR150 · County 081, Ohio · Built 2017 · 1 Lanes · 100 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
4132204
Year Built
2017
Length
10.2 m (33.5 ft)
Max Span
9.1 m
Width
23.8 m (78.1 ft)
Lanes
1
Daily Traffic
100
Material
Concrete
Design
Frame (except frame culverts)
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$137,346,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.