IR 74 over EB ""ON"" RAMP FROM US 27

0.68 MI. WEST OF IR 75 · County 061, Ohio · Built 1973 · 4 Lanes · 85,452 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
3115526
Year Built
1973
Reconstructed
2023
Length
104.9 m (344.2 ft)
Max Span
44.5 m
Width
31.8 m (104.3 ft)
Lanes
4
Daily Traffic
85,452
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.