NB US 127 RMP-I74E over EB ""ON"" RAMP FROM US 27

OVER US 127 SB · County 061, Ohio · Built 1973 · 1 Lanes · 1,753 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
3115518
Year Built
1973
Length
73.5 m (241.1 ft)
Max Span
28.3 m
Width
9.8 m (32.2 ft)
Lanes
1
Daily Traffic
1,753
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.