IR 75 over OVER CLIFTON AVENUE

1.7 MI N OF IR 74 · County 061, Ohio · Built 2013 · 9 Lanes · 129,511 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
3109887
Year Built
2013
Length
63.7 m (209 ft)
Max Span
28.8 m
Width
50.7 m (166.3 ft)
Lanes
9
Daily Traffic
129,511
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.