Bridge G24.4 over TIFFIN OVERFLOW

TR G 0.4 MI. W. OF TR 24 · County 051, Ohio · Built 1972 · 2 Lanes · 885 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
2630885
Year Built
1972
Length
28.7 m (94.2 ft)
Max Span
14.3 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
885
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.