I80 OH TPK WB over TIFFIN RIVER

0.9MI WEST OF EXIT 25 · County 051, Ohio · Built 1954 · 2 Lanes · 11,138 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
2629178
Year Built
1954
Reconstructed
1989
Length
74.7 m (245.1 ft)
Max Span
24.4 m
Width
12.3 m (40.4 ft)
Lanes
2
Daily Traffic
11,138
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.